new technology ports and terminals kuipers shipbuilding bv

Report
KUIPERS SHIPBUILDING B.V.
NEW TECHNOLOGY
PORTS AND TERMINALS
KUIPERS SHIPBUILDING B.V.
VISION:
CREATE LOGISTICS ALTERNATIVES.
ECONOMICALLY AND ENVIRONMENTALLY
FEASIBLE TO OUR CUSTOMERS.
NEW TECHNOLOGY
PORTS AND TERMINALS
KUIPERS SHIPBUILDING B.V.
MISSION:
GENERATE TAYLOR MADE PROJECTS TO FIT
ALL INTERESTED PARTIE’S(*) NEEDS.
(*)PLANET.
SHAREHOLDERS.
LOCAL AND INTERNATIONAL REGULATIONS.
NEIGHBOURS.
INVESTORS.
ETC.
NEW TECHNOLOGY
PORTS AND TERMINALS
KUIPERS SHIPBUILDING B.V.
SPECIAL CARES:
 UNDERSTAND THE LOCAL SITUATION
 GEOLOGICALLY
 SEA BOTTOM
 WINDS AND TIDES
 SHORE CONNECTION
 WEATHER USUAL AND UNUSUAL CONDITIONS
NEW TECHNOLOGY
PORTS AND TERMINALS
KUIPERS SHIPBUILDING B.V.
 UNDERSTAND THE FEASIBILITY OF THE DEAL.
 WHERE THE SUPPLY CHAIN BEGINS?
 WHERE IT ENDS?
 WHICH LINK CAN WE PROVIDE?
 WHICH VALUE CAN WE ADD TO THIS CHAIN?
 THE CIRCLE (RAW MATERIAL, PROCESSING,TRANSPORTING,
STORAGE, DISTRIBUTING, END CONSUMERS, IN FULL
COMPLIANCE WITH REGULATIONS, INVESTORS) IS
COMPLETE?
NEW TECHNOLOGY
PORTS AND TERMINALS
KUIPERS SHIPBUILDING B.V.
TECHNOLOGY IS PROJECTED AND BUILT FOR:
 DIFFERENT WIND CONDITIONS LIKE: STRENGHT,
DIRECTIONS AND VARIATIONS ALONG THE TIME.
 DIFFERENT TIDE CONDITIONS ( FLAT LAKES, WILD RIVERS,
PROTECTED SEA WATERS, OPEN SEA WATERS BY THE
SHORE, OPEN SEA WATERS FAR FROM THE SHORE.
 DIFFERENT BOTTOM STRUCTURE (ROCK, SAND, MUD)
NEW TECHNOLOGY
PORTS AND TERMINALS
KUIPERS SHIPBUILDING B.V.
 RECEIVING DIFFERENT SIZE AND KIND OF VESSELS LIKE:
OIL TANKER, CONTAINER CARRIER, CHEMICAL TANKER,
LNG TANKER OR BULK CARRIERS, CRUISE VESSEL,
FERRIES; PANAMAX, CAPE SIZE...
 OPERATING WITH DIFFERENT KIND OF CARGO’S:
FUELS, CHEMICALS, LNG.
COAL, IRON ORE, GRAIN, SUGAR.
CONTAINERS.
 OPERATING WITH SELF SUFFICIENT ELECTRICAL POWER
GENERATORS.
 GENERATE A MINIMUM OF ENVIRONMENTAL DAMAGES DUE
TO ITS SYSTEMS OF FIXING THE PORT/TERMINAL TO
SHORE/SEA BOTTOM.
NEW TECHNOLOGY
PORTS AND TERMINALS
KUIPERS SHIPBUILDING B.V.
 CAN RESIST NATURAL DISASTERS LIKE HURRICANES,




EARTHQUAKES, TSUNAMIS.
CAN BE MOVED TO ANOTHER PLACE/LOCATION AFTER IT IS
NOT NEEDED ANYMORE ON THE CURRENT LOCATION.
IT’S ALL BUILD OF: APPROVED SHIP CONSTRUCTION STEEL,
WITH AN ESTIMATED USEFUL LIFE OF 50 YEARS (MINIMUM),
WITH APPROPRIATE MAINTENANCE.
IT HAS A HYDRAULIC SYSTEM TO ADJUST AND POSITIONING
THE JETTY TO THE RIGHT OPERATIONAL POSITION.
IT’S ELECTRONICALLY CONTROLLED, TO ASSURE PROPER
OPERATIONAL CONDITIONS, LIKE: ELECTRICAL POWER
GENERATION, LOADING / UNLOADING SPEED, FUEL LEVEL.
NEW TECHNOLOGY
PORTS AND TERMINALS
KUIPERS SHIPBUILDING B.V.
 SAVES ONE THIRD TO HALF OF THE TIME TO BE BUILD,
COMPARED TO CONVENTIONAL TECHNOLOGY.
 IT COSTS LESS, ONE THIRD TO HALF OF THE MONEY TO
BUILD, COMPARED TO CONVENTIONAL TECHNOLOGY.
 THE PRODUCT WILL BE DELIVERED ON TURN-KEY BASIS.
 THE PRODUCT WILL BE COMPLETELY SURVEYED BY BUREAU
VERITAS TO COMPLY WITH THE INTERNATIONAL NORMS
APPLYING.
NEW TECHNOLOGY
PORTS AND TERMINALS
KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY FOR HANDLING IRON ORE, COAL, ETC.
SEE NEXT 5 IMAGES
NEW TECHNOLOGY
PORTS AND TERMINALS
KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY FOR HANDLING IRON ORE, COAL, ECT.
NEW TECHNOLOGY
PORTS AND TERMINALS
KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY FOR HANDLING IRON ORE, COAL, ECT.
NEW TECHNOLOGY
PORTS AND TERMINALS
KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY FOR HANDLING IRON ORE, COAL, ECT.
NEW TECHNOLOGY
PORTS AND TERMINALS
KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY FOR HANDLING IRON ORE, COAL, ECT.
NEW TECHNOLOGY
PORTS AND TERMINALS
KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY FOR HANDLING IRON ORE, COAL, ECT.
NEW TECHNOLOGY
PORTS AND TERMINALS
KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY FOR HANDLING
OIL,LIQUIDS, GAS, ETC.
SEE NEXT 5 DIAS
AND 2 MOVIES
NEW TECHNOLOGY
PORTS AND TERMINALS
KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY FOR LOADING OIL INTO TANKER SHIPS
Above we show you the option to use the “movable jetty” as an oil loading terminal.
The marine loading arm is designed to load sea-going tanker ships.
The max. loading capacity of this loading arm is max. 4000 m3/h.
The loading arm is designed for transferring mineral oil, chemicals and liquefied gases (incl. LNG)
See attached product data sheet of the loading arm B0030.
NEW TECHNOLOGY
PORTS AND TERMINALS
KUIPERS SHIPBUILDING B.V.
Connection of the loading arm
to the ships’ pipeline.
Seen from the movable jetty.
Connection of the loading arm
to the ships pipeline.
Seen from the vessel.
NEW TECHNOLOGY
PORTS AND TERMINALS
KUIPERS SHIPBUILDING B.V.
NEW TECHNOLOGY
PORTS AND TERMINALS
KUIPERS SHIPBUILDING B.V.
NEW TECHNOLOGY
PORTS AND TERMINALS
KUIPERS SHIPBUILDING B.V.
NEW TECHNOLOGY
PORTS AND TERMINALS
KUIPERS SHIPBUILDING B.V.
Double click on the picture to start the movie
NEW TECHNOLOGY
PORTS AND TERMINALS
KUIPERS SHIPBUILDING B.V.
Double click on the picture to start the movie
NEW TECHNOLOGY
PORTS AND TERMINALS
KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY FOR CONTAINER HANDLING
SEE NEXT 8 IMAGES
NEW TECHNOLOGY
PORTS AND TERMINALS
KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY FOR HANDLING
CONTAINERSHIPS IN LOWER
POSITION (NOT ABOVE
WATERLINE)
NEW TECHNOLOGY
PORTS AND TERMINALS
KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY FOR HANDLING CONTAINERSHIPS
Movable Jetty in lower position (not above the waterline)
NEW TECHNOLOGY
PORTS AND TERMINALS
KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY FOR HANDLING CONTAINERSHIPS
Movable Jetty in lower position (not above the waterline)
NEW TECHNOLOGY
PORTS AND TERMINALS
KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY FOR HANDLING CONTAINERSHIPS
Movable Jetty in lower position (not above the waterline)
NEW TECHNOLOGY
PORTS AND TERMINALS
KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY FOR HANDLING
CONTAINERSHIPS IN UPPER
POSITION (ABOVE WATERLINE)
NEW TECHNOLOGY
PORTS AND TERMINALS
KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY FOR HANDLING CONTAINERSHIPS
Movable Jetty in upper position (above the waterline)
NEW TECHNOLOGY
PORTS AND TERMINALS
KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY FOR HANDLING CONTAINERSHIPS
Movable Jetty in upper position (above the waterline)
NEW TECHNOLOGY
PORTS AND TERMINALS
KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY FOR HANDLING CONTAINERSHIPS
Movable Jetty in upper position (above the waterline)
NEW TECHNOLOGY
PORTS AND TERMINALS
KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY FOR HANDLING CONTAINERSHIPS
Movable Jetty in upper position (above the waterline)
NEW TECHNOLOGY
PORTS AND TERMINALS
KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY FOR HANDLING CONTAINERSHIPS
Movable Jetty in upper position (above the waterline)
NEW TECHNOLOGY
PORTS AND TERMINALS
KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY AS CRUISE VESSEL AND FERRY
TERMINAL
SEE NEXT 6 IMAGES
NEW TECHNOLOGY
PORTS AND TERMINALS
KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY AS CRUISE
VESSEL AND FERRY TERMINAL IN
LOWER POSITION (NOT ABOVE
WATERLINE)
NEW TECHNOLOGY
PORTS AND TERMINALS
KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY AS CRUISE VESSEL AND FERRY
TERMINAL
Movable Jetty in lower position (not above the waterline)
NEW TECHNOLOGY
PORTS AND TERMINALS
KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY AS CRUISE VESSEL AND FERRY
TERMINAL
Movable Jetty in lower position (not above the waterline)
NEW TECHNOLOGY
PORTS AND TERMINALS
KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY AS CRUISE VESSEL AND FERRY
TERMINAL
Movable Jetty in lower position (not above the waterline)
NEW TECHNOLOGY
PORTS AND TERMINALS
KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY AS CRUISE VESSEL AND FERRY
TERMINAL
Movable Jetty in lower position (not above the waterline)
NEW TECHNOLOGY
PORTS AND TERMINALS
KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY AS CRUISE
VESSEL AND FERRY TERMINAL
IN UPPER POSITION (ABOVE
WATERLINE)
NEW TECHNOLOGY
PORTS AND TERMINALS
KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY AS CRUISE VESSEL AND FERRY
TERMINAL
Movable Jetty in upper position (above the waterline)
NEW TECHNOLOGY
PORTS AND TERMINALS
KUIPERS SHIPBUILDING B.V.
MOVABLE JETTY AS CRUISE VESSEL AND FERRY
TERMINAL
Movable Jetty in upper position (above the waterline)
NEW TECHNOLOGY
PORTS AND TERMINALS
KUIPERS SHIPBUILDING B.V.
THANK YOU FOR
YOUR ATTENTION
Kuipers Shipbuilding B.V.
Het Tasveld 21
3342 GT Hendrik Ido Ambacht
The Netherlands
Tel: +31 78 683 3280
www.kuipersshipbuilding.com
info@kuipersshipbuilding.com
Peter Boezel
Technical Department
Skype
:
Email
: peter@kuipersshipbuilding.com
Phone : +31 653 920 365
Gerhardus Kuipers
C.E.O.
Skype : gerharduskuipers
Email : gerhardus@kuipersshipbuilding.com
Phone : +31 630 040 794

similar documents