KALINDEE RAIL NIRMAN (ENGINEERS) LTD
Founded as a partnership firm for execution of Signaling contracts.
Became a Public Limited Company.
Diversified in execution of Ballasted Trackwork.
Diversified in execution of Optic Fiber Communication.
Diversified in execution of Automatic Fare Collection System for Metro.
Diversified in execution of Ballastless Trackwork for Metro.
Diversified in the field of Electronic Interlocking.








First Signalling work on contract in India.
First Indian Company to Install Longest OFC Network of 1000 Kms.
First Indian company to achieve Highest Speed of Track Construction (2Km per
day).
First Indian Company to achieve Highest Test Speed of track (130 Kmph. on the
very first trial day).
First Indian Company to execute successfully largest Signalling contract of 54
Stations.
First Private Company to do Turnkey Rail Facility Work.
First Indian Company to install Contact Less Automatic Fare Collection System for
Delhi Metro.
First Indian Company to install Ballast Less Track for Underground Section of Delhi
Metro.
Maintenance &
Warranty Services
Training
Documentation
Commissioning
Testing
Installation
Supply of all Materials & Equipments
Preparation of Engineering Drawings
Design
Railway
Metro
Private Siding
BALLASTED TRACK



BALLASTLESS TRACK



SIGNALLING



TELECOM



AUTOMATIC
FARE
COLLECTION SYSTEM



Note: -Civil work related to track work like Earthwork, Bridge work, Buildings etc is also executed by us.
Gauge Conversion
1400 Kms
New Line & Siding Line
742 Kms
Installations of Points & Crossings
1300 Nos
Yard Remodeling
125 Kms
Ballast Less Track
150 Kms
Major Bridges
35 Nos
Minor Bridges/Culverts
400 Nos
Building
Earthwork
30 Nos
5 Million Cum
Conventional Signalling
260 Stations
Panel Interlocking
362 Stations
Color Light Signalling
340 Stations
Level Crossing Interlocking
256 Nos
Axle Counters
225 Nos
Audio Frequency Track Circuits
115 Nos
Token Less Block Systems
215 Stations
Multi Aspect Signalling
58 Stations
Solid State Interlocking
106 Stations
Signaling for 25 KV AC Traction
59 Stations
Major Yard Signalling
38 Nos
Route Relay Interlocking
40 Stations
Electronic Interlocking
44 Stations
Under Ground Copper Cables
8490 Kms
Under Ground OFC Systems
3084 Kms
Over Head Lines
400 Kms
Mobile Train Radio
220 Cabs
OFC Equipment Installation
112 Stations
Wireless Network (GSM)
60 Kms
Microwave / UHF Radio Towers
32 Nos
MSO & EBTS
4 Nos
Automatic Fare Collection Gates
1382 Gates
Ticket Office Machines
644 Nos
Electrical Distribution Cabinets
720 Nos
Ticket Readers / AVM
368 Nos
OCC / SDC
7 Nos
Networking Equipments
478 Nos
Ticket Vending Machine
178 Nos
COMPOSITE WORK (TRACK AND S&T) IN NORTH CENTRAL
RAILWAY.
• Track Work
• Work Value
: 127.14Kms.
: US $15.09 Million
DOUBLING PROJECT IN WEST CENTRAL RAILWAY.
• Track Work
• Work Value
: 89 Kms.
: US $ 30.94 Million
COMPOSITE WORK (CIVIL, S&T AND TRACK) IN NORTH
WESTERN RAILWAY.
• Track Work
• Work Value
: 59.5 Kms.
: US $18.57 Million
TRACK AND S&T WORK IN DIVISION OF NORTH EASTERN
RAILWAY, UTTAR PRADESH.
• Track Work
• Work Value
:106.92 Kms.
: US $ 24.26 Million
TRACK WORK AND INSTALLATION OF THIRD RAIL IN KOLKATA
METRO RAIL.
• Track Work
• Work Value
: 25 Km
: US $18.74 Million
TRACK AND RAILWAY AUTOMATION WORK IN JAIPUR METRO.
• No.of Stations
• Work Value
: 8 Stations
: US $ 5.35 Million
TRACK AND S&T WORK IN DIVISION OF SOUTH CENTRAL
RAILWAY, ANDHRA PRADESH
• Track Work
• Work Value
: 64 Kms.
: US $ 20.21 Million
BALLASTED AND BALLASTLESS TRACK WORK FOR DELHI MRTS
PROJECT PHASE -III.
• Track Work
• Work Value
: 92 Km
: US $44.16 Million
TRACK AND SIGNALLING WORK OF NORTH CENTRAL RAILWAY.
• Track Work
• Work Value
: 92 Kms.
: US $ 30.17 Million
TRACK WORK FOR DELHI METRO CORRIDOR PHASE-I.
• Track Work
• Work Value
: 40Kms.
: US $ 5.5 Million
TRACK WORK FOR DELHI METRO CORRIDOR PHASE II.
• Track Work
• Work Value
: 70 Kms.
: US $ 2.24 Million
TRACK WORK FOR RAPID METRO RAIL, GURGAON.
• Track Work
• Work Value
: 8 Km
: US $ 1.89 Million
GAUGE CONVERSION IN SOUTHERN RAILWAY.
• Track Work
• Work Value
: 150 Kms.
: US $ 40.45 Million
TRACK WORK FOR DELHI METRO AIRPORT LINE.
• Track Work
• Work Value
: 50Kms.
: US $16.12 Million
Konkan Railway
• Biggest Signalling Project Undertaken (54
Stations Panel Interlocking)
• Biggest Telecom Project (OFC System
1000 Km)
• B.G.Track in Deep Cuttings 60 Kms.
• Highest Quality standards maintained.
• On Time Completion.
• Work won all round appreciation.
Track & Civil
Signalling
Equipments
Railway
Automation
COMPANY
COUNTRY
PROJECTS
TSO
France
•
Track Work For Delhi Metro Corridor Phase-I.
Pandrol
UK
•
Track work For Kolkata Metro Rail Corporation.
COMPANY
COUNTRY
PROJECTS
Siemens
Germany
•
For various Signalling Projects in Indian Railways.
Ansaldo
Italy
•
For various Signalling Projects in Indian Railways.
COMPANY
COUNTRY
Samsung SDS
Korea
PROJECTS
•
•
•
Delhi Metro AFC Work For Phase I & Phase II
Jaipur Metro AFC Work For Phase I.
Bangalore Metro AFC Work For Phase I.
1
2
3
4
5
1.
Eastern Railway
Signalling and Telecommunication work in Sealdah Division
of Eastern Railway.
2.
North Eastern Railway
Composite work in Lucknow division of North Eastern
Railway.
3.
South Eastern Railway
Construction of 3rd Line between Rajkharswan-Sini section
of South Eastern Railway.
4.
Northeast Western Railway
Electronic Interlocking in Rewari-Sadalpur-Hisar section of
Bikaner division of North Western Railway.
5.
Rail Vikas Nigam Limited
Composite work in Kota & Bhopal Division of West Central
Railway.
1
2
3
4
1.
Delhi Metro Rail Corporation
Total Ballastless Track of 73.69 TKM.
Total Ballasted Track of 33.47 TKM.
2.
Bangalore Metro Rail Corporation
Total Ballastless Track work of 18 TKM.
3.
Jaipur Metro Rail Corporation
Total Ballastless Track of 26.51 TKM.
Total Ballasted Track of 3.38 TKM.
4.
Kolkata Metro Rail Corporation
Total Ballastless Track of 29.10 TKM.
Total Ballasted Track of 4.25 TKM.
5.
Rapid Metro, Gurgaon Haryana
Total Ballastless Track work of 8 TKM.
5
1
2
3
4
5
1.
National Thermal Power
Corporation Limited
Signalling and Telecommunication work along with
associated electrical work for NTPC Kahalgaon.
2.
Aravali Power Company
Private Limited (India)
Railway siding including Earthwork, Civil and Ballast supply
for MGR Yard in APCL Plant, Jhajjar Haryana.
3.
Bharat Oman Refineries
Signalling work including supplies of material, designing,
testing, commissioning at BORL in-plant Yard at Bina in
Bhopal Division.
4.
Hindustan Petroleum
Corporation Ltd.
Railway Siding for Hindustan Petroleum at Somnathpur,
Balasore, Odisha
5.
Mumbai Port Trust
Remodelling & Upgradation of Railway Yard, includes
Track Linking, Ballast Supply at Wadala, Mumbai.
1
2
3
4
1.
Vedanta
Railway Siding and Linkage for Power Plant of 1215 MW
capacity at Jharsuda, Odisha..
2.
Adani Ports
Track Laying and Linking for Gujrat Adni Port Limited,
Mundra.
3.
Indian Oil Tanking
Composite work at Jasai-Chirle Yard of Central Railway as
per requirement of Indian Oiltanking Ltd., Navghar
Mumbai.
4.
Reliance Energy
Railway Siding in 2x300 MW DCR Thermal Power Project,
Yamuna Nagar, Haryana.
Kalindee Rail Nirman (Engineers) Ltd.
2nd Floor, Building No: 9A,
Cyber City, DLF Phase-III,
Gurgaon, Haryana
www.kalindee.net | [email protected] | 0124-4674800