ATC17 (ppt) - Eurocontrol

Objective ATC 17
ESSIP Plan 2014
Comprehensive Explanation
Target Date: 12/2018
SCOPE: ECAC – All States except SK
Electronic dialogue as automated assistance to controller during
coordination and transfer addresses the facilities and processes
between ATC components serving ATC units.
ATC17 complements ITY-COTR.
 Co-ordination prior to the transfer of flights from one ATC unit to
the next;
 Transfer of communication from one ATC unit to the next ATC
unit of such flights;
 Support the exchange of OLDI messages related to the Basic
procedure and, if applicable, SSR Code Assignment Message.
ESSIP Plan 2014 / Objective ATC17
What is new or has changed for ESSIP Plan ed.
 Deletion of SLoA REG01 on safety oversight (action carried across
the ESSIP Plan ed. 2014)
ESSIP Plan 2014 / Objective ATC17
Link to European ATM Master Plan and/or
Interim Deployment Programme (IDP)
Eur. ATM Master Plan:
 [CM-0201] – Automated Assistance to Controller for Seamless
Coordination, Transfer and Dialogue
 WP 5.2
ESSIP Plan 2014 / Objective ATC17
Most important SLoA(s)
 Note: whereas this objective is defined with an ECAC scope, it will
be the decision of the individual ATS Provider to:
 define its local applicability in terms of relevant ATSUs, and
 identify the processes to be implemented (refer to ATC17 SLoAs and in
particular, their finalisation criteria, for the complete list of processes).
ESSIP Plan 2014 / Objective ATC17
Finalisation Criteria and Closed Questions
For ASP01:
 Deliver safety arguments for all changes related to implementation of electronic
dialogue for Coordination and Transfer.
For ASP02/3/4 (important to clearly identify ATSUs involved and which processes
are implemented):
 Ground systems updated
 Technical File with evidences of compliance to EC Declaration of Verification;
 Functions (form the list in it he individual SLoAs) documented and in operational use.
For ASP05:
 Training plans updated and training package developed by the ANSP for the use of
electronic dialogue procedure.
ESSIP Plan 2014 / Objective ATC17
Supporting Material
 EUROCONTROL-Specification for On-Line Data Interchange
(OLDI) Edition 4.2 (OJEU Reference 2011/C 146/05)
 EUROCONTROL-System Supported Coordination (SYSCO)
Implementation Guidelines
ESSIP Plan 2014 / Objective ATC17
ESSIP Report 2014
 Objective introduced in the ESSIP Plan in 2012.
 By end of 2013, 1 State has reported it as completed; 6 reported it
partially completed (functionalities available and ATCOs trained but
not implemented operationally). This requires agreement with
neighbouring ACCs where the same functionalities must be
 From the reported ANSP plans, the current estimate for
achievement is 12/2018.
ESSIP Plan 2014 / Objective ATC15
Links and contacts
 Objective Coordinator:
Dell’Orto Luca, +32 2 729 3325
[email protected]
 EUROCONTROL Objective Expert:
Stephen Morton, +32 2 729 3492
[email protected]