NCOP Presentation Aug 2012 (2)

Report
Presentation to the
National Council of Provinces
01 August 2012
Executive Mayor
Cacadu District Municipality
Cllr K. Kekana
1
CONTENTS
1.
Introduction and Overview
2.
Service Delivery Outlook
3.
Water and Sanitation
4.
Roads and Stormwater
5.
Human Settlements
6.
Community Services
7.
Conclusion
2
BACKGROUND
1. The Cacadu District Municipality and the Nelson Mandela Metro were
created in 2001 , from the erstwhile Western District Council.
2. Prior to 2001, the Western District Council main revenue source was
Regional Council levies. The funds were primarily directed to fund
infrastructure in the local municipalities / towns.
3. There was a significant reduction in the revenue stream of the Cacadu
DM with the revenue base being reduced by 94%.The RSC levy income
reduced from R155m to R15m.
4. Operations were downsized to ensure financial sustainability in the long
term. The staff establishment was reduced from 255 to 56.
5. In 2001 it became evident that CDM had to develop a credible business
strategy to remain relevant and add value in the District.
6. Various strategies were adopted to make the institution viable. However
bulk infrastructure services remain a major challenge.
LOCALITY
NIEU-BETHESDA
QUEENSTOWN
Northern Province
TARKASTAD
Gauteng
North West
CRADOCK
Mpumalanga
WHITTLESEA
GRAAFF-REINET
Camdeboo
CATHCART
ABERDEEN
Free State
Kwazulu Natal
Alfred Nzo
SEYMOUR
PEARSTON
Northern Cape
BEDFORD
ADELAIDE
SOMERSET EAST
COOKHOUSE
DMA
KEISKAMMAHOEK
Ukhahlamba
ALICE
FORT BEAUFORT
MIDDLEDRIFT
Eastern Cape
KLIPPLAAT
Ikwezi
Western Cape
O.R. Tambo
The Blue Crane Route
JANSENVILLE
Makana
Chris Hani
PEDDIE
RIEBEECK EAST
WILLOWMORE
ALICEDALE
STEYTLERVILLE
GRAHAMSTOWN
Amatole
KIRKWOOD
Cacadu
Baviaans
PATERSON
DMA
BATHURST
Ndlambe
ADDO
Sundays River
ALEXANDRIA
Nelson Mandela Metro
Valley
JOUBERTINA
Kou-Kamma
HANKEY
KAREEDOUW
HUMANSDORP
ST. FRANCIS BAY
1
DESPATCH
Kouga
PORT ELIZABETH
STORMS RIVER
JEFFREYS BAY
PORT ALFRED
KENTON ON SEA
UITENHAGE
5
Introduction
• Cacadu is the largest District in the Eastern Cape, being about 58243 SQ
KM in size
•Cacadu consists of 9 Local Municipalities namely: Camdeboo; Blue Crane
Route; Ikwezi; Makana; Ndlambe; Sundays River Valley; Baviaans; Kouga
and Kou-Kamma (30 towns and 25 settlements)
•Consequently, it has the longest road network about 8420km.
•Cacadu District has a population of about 388210 (census 2001). Global
insight 420 000 (2010)
6
ECONOMIC OUTLOOK
•
•
•
•
•
•
•
•
Recent service economic study shows that about 38% of the population is
living below minimum acceptable income level.
4% Population living with less than R16/day. Africans experience high
poverty levels.
Unemployment is ranging at 21%.
HIV/AIDS profile is escalating with 8% population infected.
Inequality is lower than national average but illiteracy higher compared to
the Country. There is a steady improvement in education progress.
Housing and Electrification are showing steady improvements.
Agricultural annual growth is showing a rise since recession (Global
Insight) of 2008 but still lower than the growth prior to the recession.
Manufacturing industry is very limited
7
ECONOMIC OUTLOOK
• Agriculture and Tourism are the main economic drivers
• Agriculture consists of sheep, goat, dairy, beef, ostrich, citrus,
apples, pineapples, chicory, wool, mohair
• Tourism includes National parks, game reserves, ecotourism, coastal, adventure, festivals
• Government’s contribution to the economy cannot be
underplayed.
• Lack of local economic activity in small towns affects the
ability of LMs to raise their own revenues.
INFRASTRUCTURE
CHALLENGES
•90% of the population have access to water –(18% standpipes, 1.4 %
boreholes, 1.4% Natural sources)
•Ndlambe has 69% access to water.
•Water demand will increase by 40% in 5 years. In Ndlambe and Kouga, this
increase will reach 82% and 64% respectively (of the current supply), due to
the influx of holiday makers, if the District can maintain is competitive edge
on tourism.
•Ikwezi LM has the worst water shortages since it relies on boreholes for its
water source leaving the municipality very vulnerable during dry seasons.
•There is a great reliance on boreholes in the district especially in the Ikwezi,
Baviaans, Blue Crane (Pearston) and the rural areas of Makana.
•All LMs are WSA/WSP’s This function is generally poorly performed and
under resourced with both technical skills, financial and material resources.
INFRASTRUCTURE
CHALLENGES
•Consequently, water quality is poor and a health hazard in some areas.
•There is a need to focus at providing access to a basic level of service as
well as increasing the capacity of existing bulk and reticulation connector
infrastructure.
•Most of the Waste water treatment works in our area are over extended.
•Major upgrades in bigger town are needed e.g. Port Alfred, Humansdorp,
Jeffrey’s Bay and Somerset East.
•There are still 5834 informal buckets in our area that needs to be
eradicated. These areas are Kouga, Makana, Sundays River Valley and Blue
Crane Route Municipality
INFRASTRUCTURE
CHALLENGES
•There is also a challenge of VIP toilets in the district that need to be
upgraded to a waterborne system in Makana and Ndlambe. (This cannot be
achieved unless there is a sustainable water supply.)
•All the necessary infrastructure is however not in place.
•Maintenance and refurbish programme must be embanked on.
•Currently a large portion of the infrastructure is beyond design life and
should have been replaced already by the Municipality.
•The funds allocated to Municipalities to do maintenance work is insufficient
and this is causing acid stripping.
•No funds are available to do any refurbishment within the Municipalities.
Reliance on MIG funding.
MIG ALLOCATION
12
Bulk requirements to address
HUMAN SETTLEMENT Challenge
MUNICIPALITY
HOUSING
NEEDS
CHALLENGES
Kouga
11440
Water & Waste water
Makana
14026
Bucket & sanitation
Ndlambe
10026
Sewerage System
Roads, Transport & Public
Works
•The actual allocation on Capital Roads Projects by the Province is R76m for
Cacadu 2012/13.
•This allocation is not proportional to the amount of roads in the District which is
about 8420km in length.
•Roads in our District are in need of Rehabilitation and Upgrades.
•The District has key strategic routes which are used by Tourists; transportation
of goods and services like Agricultural products But these roads remain gravel
and receive low or no maintenance.
•A number of Provincial roads in the District remain incomplete although they
were already started. eg. R75; the gravel road MR605 from N9 to NieuBethesda.
•Roads listed (refer next slide) as critical condition amounts to R1.2b and this list
was submitted to DRT & PW, R76m is a very small fraction to R1.2b.
LIST OF PRIORITY ROADS
ROAD/ROUTE
LENGTH IMPROVEMENT
NEEDED
COST
Surfacing
74
Surfacing
R370m
Gravel Road
5
Surfacing
R25m
Surfacing of R337
7
Surfacing
R35m
St.Georges to Addo R335
44
Overlaying
wearing course
R132m
Zuurberg/Addo
20
Surfacing
R100m
Steytlerville to Willowmore
concrete road
40
Resurfacing
R200m
Main road R389
15
Surfacing
R12,5m
SANITATION & WATER
PROJECTS SUMMARY
No. of
Municipalities
Estimated Cost
Comments
Upgrading of Waste Water Works
6
R166, 800m
Upgrading of Sewerage Reticulation
6
R116, 663m
Construction of Bulk Sewer Pipeline
6
R122, 400m
No
Funding
Available
Construction/Upgrading of Water
Treatment Works
5
R170, 275m
Upgrading and Construction of Bulk
Water Supply
6
R500, 119m
Upgrading of Water Reticulation
3
R106 737m
Rainwater Harvesting
1
R49, 950m
Service Delivery Needs
TOTAL
R1, 182, 9, 950B
DISPOSAL SITES PROJECTS
Service
Delivery Needs
No. of
Municipalities
Estimated Cost
Comments
Upgrading of
Waste Disposal
Sites
1
R18, 000m
No funding
Licensing of
Waste Disposal
Site
1
R2, 000m
No funding
Construction of
Solid Waste
Transfer
Sanitation
1
R5, 300m
No funding
Rehabilitation of
Landfill Sites
1
R12, 000
No funding
TOTAL
R37, 300m
ELECTRICITY PROJECTS
Service Delivery Needs
No. of
Estimated
Municipalities Cost
Installation of high Mast lightning
2
R5, 450m
Installation of LV and MV Electricity
Lines
1
R15, 000m
Upgrading and Extension of Electrical
Network
1
R50, 000m
Housing Electrification
1
R4, 000m
TOTAL
R74, 450m
Comments
No funding
Available
Community Facilities
Projects
Service Delivery Needs
No. of
Estimated
Municipalities Cost
Construction of Multi-Purpose
Centres
3
R12, 600m
Construction and Upgrading of
Sportsfield
4
R50,229m
Construction of Indoor Sporting Facility
1
R12, 000m
Upgrading and Refurbishing of Parks and
Playgrounds
2
R5, 100m
Development of New Cemetries
1
R10, 000m
6
R10, 000m
TOTAL
R90 929m
Comments
No funding
Available
CONCLUSION
*
*
*
*
*
Although CDM is rated highly in terms of service ability of our
communities, setting the existing infrastructure is over extended.
The existing capacities were designed in exclusion of unprecedented
population growth which is a resultant of integrated human
settlement planning, migration, economic growth of middle income
black communities since 1994.
Existing infrastructure is dilapidating, reaching the end of its design
life, thus maintenance costs are also escalating.
Provincial Allocation of Roads Infrastructure is insufficient, unfair to
our communities and other road users crossing the District to other
Provinces.
A massive backlog of around R3.5B is herewith submitted with
details in the narrative.
20
THANK YOU
21