2013 Workshop Presentation

Report
COMMERCIAL &
INDUSTRIAL
STANDARD OFFER
PROGRAM
2013 WORKSHOP
WELCOME & INTRODUCTION

JARRETT SIMON


LORETTA BATTLES


DIRECTOR, ENERGY EFFICIENCY
ADMINISTRATION, COMMERCIAL & INDUSTRIAL
STANDARD OFFER PROGRAMS
YOLANDA SLADE

PROGRAM MANAGER, STANDARD OFFER PROGRAMS
INTRODUCTIONS (CONT.)

NEXANT TEAM
JESSY SHAO
 DING LI
 KAI QIU
 GLEN NICOL

AGENDA

CENTERPOINT COMMERCIAL ENERGY EFFICIENCY PROGRAMS

2012 PROGRAM SUMMARY

2013 PROGRAM OUTLINE

2013 PROGRAM HIGHLIGHTS

SUPPLIER DIVERSITY

LIGHTING SPREADSHEET OVERVIEW

Q&A

DATABASE TRAINING (IF APPLICABLE)
CENTERPOINT
ENERGY 2013
COMMERCIAL
PROGRAMS
COMMERCIAL ENERGY EFFICIENCY
PROGRAMS

ENERGY SHARE LOAD MANAGEMENT PROGRAM
 DAVID

DEMAND RESPONSE PROGRAM FOR COMMERCIALS CUSTOMERS WITH THE
ABILITY TO CURTAIL ENERGY USAGE DURING PEAK PERIODS.


DZIERSKI – [email protected]
PROGRAM KICK OFF – NOVEMBER 5TH, 2012
SUSTAINABLE SCHOOLS PROGRAM
 CHERYL

BOWMAN – [email protected]
PROGRAM OFFERED TO PUBLIC AND PRIVATE SCHOOLS THAT PROVIDE
EDUCATIONAL MATERIALS AND ACTIVITIES THAT PROMOTE ENVIRONMENTALLY
CONSCIOUS BEHAVIOR IN THE STAFF AND STUDENTS RESULTING IN ENERGY
SAVINGS AT THE SCHOOL AND IN HOMES.
COMMERCIAL ENERGY EFFICIENCY
PROGRAMS (CONT.)

TEXAS SCORE/CITY SMART PROGRAM
 CHERYL

OFFERED TO SCHOOL DISTRICTS K-12, HIGHER EDUCATION, CITY AND
COUNTY FACILITIES IN THE CENTERPOINT ELECTRIC DISTRIBUTION TERRITORY.
SERVICES INCLUDE PLANNING, FINANCIAL ANALYSIS, AND TECHNICAL
SUPPORT.


BOWMAN – [email protected]
PROGRAM KICK OFF SCHEDULED THURSDAY, NOVEMBER 29TH. OPEN TO SCHOOL
DISTRICTS AND CITY OFFICIALS ONLY.
ADVANCED LIGHTING
 CALVIN

BURNHAM – [email protected]
AWARDS INCENTIVES TO COMMERCIAL CUSTOMERS WHO INSTALL
ADVANCED, HIGH EFFICIENCY LED LIGHTING SYSTEMS FOR PARKING
GARAGES, PARKING LOTS, AND OTHER OUTDOOR LIGHTING
COMMERCIAL ENERGY EFFICIENCY
PROGRAMS (CONT.)

RETRO-COMMISSIONING PROGRAM
 CALVIN

BURNHAM – [email protected]
A PROGRAM THAT PROMOTES THE TUNE-UP OF EXISTING COMMERCIAL AND
INDUSTRIAL BUILDINGS BY EVALUATING FACILITY SYSTEMS AND IMPLEMENTING
LOW-COST/NO-COST MEASURES.
HEALTHCARE MARKET
TRANSFORMATION PROGRAM
 TARGETING MID TO SMALL HEALTHCARE FACILITIES
 PROGRAM OFFERINGS:
– CASH INCENTIVES FOR IMPLEMENTATION OF ELIGIBLE ENERGY
CONSERVATION MEASURES
– SERVICES FOR ELIGIBLE CUSTOMERS, INCLUDE: SAVINGS
CALCULATIONS, ASSISTANCE WITH MEASUREMENT &
VERIFICATION, ENERGY ASSESSMENTS, RECOMMENDATIONS
FOR OPERATIONAL IMPROVEMENTS, ETC.
 1ST YEAR ENROLLMENT BEGINS JANUARY 2013
 PROGRAM MANAGER:

CHERYL BOWMAN, 713-207-5631 - [email protected]
2012 PROGRAM
SUMMARY
2012 PROGRAM SUMMARY

$6.2 M ORIGINAL BUDGET

SOLD OUT MARCH 2012





WAITING PROJECTS FROM 2011
INCREASED INCENTIVE LEVEL
AGGRESSIVE MARKETING EFFORTS
9 MW GOAL
EOY TOTALS






$6.3 M INCENTIVES RESERVED
12.5 MW REDUCTION
139 PROJECTS SUBMITTED
1 WAIT LIST PROJECTS – NOT ACTIVATED
94 COMPLETED PROJECTS
16 CANCELLED PROJECTS
MEASURE DISTRIBUTION
MEASURE TYPE - % KW SAVINGS
2%
0%
1%
Building Automation
Chiller
38%
DX Units
LED
Lighting
52%
VFD
Window Film
2%
5%
CONSTRUCTION TYPE
RETROFIT/NEW CONSTRUCTION - % INCENTIVES
DISTRIBUTION
12%
New
Retro
88%
SAVINGS METHODOLOGY
M&V METHODOLOGY - % INCENTIVES DISTRIBUTION
24%
Deemed
Full
Simplified
3%
73%
CUSTOMER TYPE
CUSTOMER TYPE - % INCENTIVES DISTRIBUTION
13%
4%
City/Government
4%
Commercial
Data Center
Educational
17%
Health Care
54%
4%
3%
Industrial
Lodging
Retail
1%
2012 PROGRAM CONCERNS

PROVIDE PROJECT ID NUMBER WITH ALL CORRESPONDENCE

SUBMIT PA PRIOR TO CONTRACT AWARDED

REQUEST FOR PRE INSPECTIONS PRIOR TO PA SUBMITTAL

CONDUCT INSTALLATION PRIOR TO PA SUBMITTAL AND APPROVAL

PROJECT DURATION LONGER THAN 3-6 MONTHS

AGGREGATED PROJECTS WITH LESS THAN 20 KW SAVINGS
CONTRIBUTION

USE REPLACED LIGHTING OR COOLING EQUIPMENT IN OTHER FACILITIES
2013 PROGRAM
OVERVIEW
STANDARD OFFER PROGRAM

OPEN TO ALL ELIGIBLE PROVIDERS WITHIN THE
CNP TERRITORY
 TRANSMISSION
CLASS (>69KV) ARE EXCLUDED
 FIRST COME, FIRST SERVE
 ONE YEAR PAYOUT
 PAYMENTS TIED TO VERIFIED SAVINGS
 STANDARDIZED TERMS FOR ALL PARTICIPANTS
 RETROFIT AND NEW CONSTRUCTION MEASURES
PROGRAM PARTICIPANTS ROLES
PROGRAM ROLE
PROGRAM
ADMINISTRATOR
PROJECT SPONSOR
CUSTOMER
RESPONSIBILITIES
OVERSEE THAT PROGRAMS FOLLOW PUCT RULES
ADJUST PROGRAM BUDGET AS NEEDED
ENTER STANDARD AGREEMENTS WITH THE PROJECT SPONSOR
REVIEW, APPROVE OR REJECT PROGRAM APPLICATIONS
VERIFY AND INSPECT THAT MEASURES MEET INTENDED PURPOSE
ADMINISTER INCENTIVE DOLLARS
IDENTIFY PROJECT OPPORTUNITIES
• ACCURATELY IDENTIFIES ENERGY EFFICIENCY MEASURES TO BE INSTALLED
• MARKETING
VERIFY CUSTOMER ELIGIBILITY
• CUSTOMER IN CNP ELECTRIC SERVICE TERRITORY
• CUSTOMER DOES NOT RECEIVE TRANSMISSION CLASS SERVICE (CLASSIFIED AS
INDUSTRIAL)
INSTALL AND DOCUMENT ENERGY SAVINGS
CONTRACT WITH PROJECT SPONSOR
ALLOW CNP TO CONDUCT ON-SITE INSPECTIONS
INSTALL AND DOCUMENT ENERGY SAVINGS
PROJECT SPONSOR REQUIREMENTS

PROJECT SPONSORS MUST HAVE:
 ALL
APPROPRIATE LICENSES/CERTIFICATIONS
 EVIDENCE
OF TECHNICAL AND MANAGERIAL
CAPABILITIES AND EXPERIENCE
 EVIDENCE
OF FINANCIAL CAPABILITY
 ADEQUATE
INSURANCE
 REFERENCES
PROJECT SPONSOR

MAY BE:
 NATIONAL
OR LOCAL ENERGY SERVICE COMPANIES
(ESCOS)
 NATIONAL OR LOCAL COMPANIES THAT PROVIDE
ENERGY-RELATED SERVICES OR PRODUCTS
 LOCAL CONTRACTORS
 COMMERCIAL PROPERTY DEVELOPERS
 DESIGN/BUILD FIRMS
 ARCHITECTURAL AND ENGINEERING FIRMS
 INDIVIDUAL COMMERCIAL CUSTOMERS
CUSTOMER

MAY BE:
 ANY
NON-RESIDENTIAL CUSTOMER TAKING
SERVICE AT A METERED POINT OF DELIVERY AT
A DISTRIBUTION VOLTAGE (<69KVA)
 NON-PROFIT
 GOVERNMENT ENTITY
 EDUCATIONAL INSTITUTION

MUST ALLOW PRE AND POST
INSPECTION AT CUSTOMER SITE
PROJECT ELIGIBILITY

WITHIN CENTERPOINT ENERGY ELECTRIC SERVICE
TERRITORY
 PROVIDE


ESI NUMBER, BEGINNING 100890
COMPLETE SPONSOR APPLICATION AND 5%
DEPOSIT REQUIRED TO SUBMIT APPLICATION
SPREADSHEET UPLOADS MUST BE COMPLETE
WITHIN THE SPONSOR APPLICATION
PROJECT ELIGIBILITY (cont.)

LARGE COMMERCIAL




MINIMUM REDUCTION OF 20KW AND/OR 120,000KWH FOR SINGLE
SITE PROJECT
MINIMUM REDUCTION OF 50KW AND/OR 300,000KWH FOR
AGGREGATED SITES PROJECT
CUST MUST HAVE MINIMUM LOAD OF 100 KW AT PEAK, AGGREGATE
CUST MUST REACH 250KW
SMALL COMMERCIAL



MAY NOT HAVE MORE THAN 100KW PEAK DEMAND AT A SINGLE SITE
MAY NOT HAVE MORE THAN 250KW AGGREGATE PEAK DEMAND
ALLOWS UP TO 20KW AND/OR 120,000KWH REDUCTION AT NONRESIDENTIAL SITE
AGGREGATING PROJECTS

SIMILAR PROJECTS SHOULD:
 HAVE
SAME PROJECT SPONSOR
 INCORPORATE
SAME MEASURES
 HAVE
LIKE OCCUPANCY SCHEDULES
 HAVE
SAME FUNCTIONAL USE
 HAVE
SAME ENERGY CONSUMPTION PATTERNS
 COMMON
MEASUREMENT &
VERIFICATION PLAN
MEASURE ELIGIBILITY

PRODUCES MEASURABLE PEAK DEMAND AND/OR ENERGY SAVINGS

10 YEARS PERSISTENCE

PEAK DEMAND IS DEFINED AS

JUNE 1 THROUGH SEPTEMBER 30, M – F, 1PM – 7PM

DECEMBER 1 THROUGH FEBURARY 28, M – F, 6AM – 10AM and 6PM – 10PM

EXCLUDING WEEKENDS AND FEDERAL HOLIDAYS

PERMANENTLY INSTALLED (NO PLUG LOAD)

EXCEEDS MINIMUM EFFICIENCY STANDARDS
EXAMPLES OF ELIGIBLE MEASURES

CHILLER REPLACEMENT

PACKAGED COOLING UNIT REPLACEMENT

LIGHTING RETROFITS

LAMP AND BALLAST

MOTOR EFFICIENCY MEASURES

WINDOW FILM APPLICATIONS

ROOFING APPLICATIONS

INDUSTRIAL PROCESS MEASURES
INELIGIBLE MEASURES

FUEL SWITCHING TO ELECTRIC

MEASURES THAT REQUIRE NO CAPITAL INVESTMENT

MEASURES THAT DO NOT HAVE 10 YEARS PERSISTENCE

MEASURES THAT RECEIVE INCENTIVES IN OTHER CNP PROGRAMS

REDUNDANT EQUIPMENT (IE BACKUP CHILLERS)

LAMP REPLACEMENTS WITHOUT THE BALLAST

REMOVABLE MEASURES (IE PLUG LOAD, VENDING MACHINES)

O&M MEASURES (IE AIR FILTERS)
PROGRAM PROCESS

SECURE AN APPLICABLE PROJECT

REGISTER AS A PROJECT SPONSOR

COMPLETE CONTRACT DOCUMENTATION, IF NEW SPONSOR

SUBMIT PROJECT APPLICATION

SIGN STANDARD AGREEMENT

SIGN PROJECT AUTHORIZATION FORM

INSTALL PROJECT

SUBMIT INSTALLATION REPORT

CONDUCT MEASUREMENT & VERIFICATION

SUBMIT SAVINGS REPORT
APPLICATION DEPOSIT



APPLICATION DEPOSIT IS 5% OF REQUESTED
INCENTIVE
DEPOSIT MUST BE SUBMITTED BEFORE PROJECT
APPLICATION CAN BE SUBMITTED
DEPOSIT IS FULLY REFUNDABLE
PERCENT OF ESTIMATED
INCENTIVE PAYMENT RECEIVED
PERCENT OF
DEPOSIT REFUNDED
75%+
50%-74.9%
0%-49.9%
100%
50%
0%
APPLICATION SUBMITTALS

THE FOLLOWING INFORMATION MUST BE SUBMITTED
AS PART OF THE APPLICATION PROCESS:

PROJECT INFORMATION

PROJECT DESCRIPTION

SITE INFORMATION

SAVINGS CALCULATION

ESTIMATED COMPLETION SCHEDULE

QUALIFICATION SET


REFERS TO PROJECT SPONSOR
SPONSOR CONTACT

SHOULD THE PRIMARY CONTACT CHANGE,
PROJECT SPONSOR SHOULD UPDATE
APPLICATION SUBMITTALS
(cont.)
 DOCUMENTS MUST BE PROVIDED AS PART OF THE
APPLICATION PROCESS:
CUT SHEET OF THE NEW LIGHTING FIXTURE INDICATING LAMP TYPE, LAMP
WATTAGE, BALLAST TYPE AND BALLAST FACTOR
LIGHTING
DISPOSAL RECORDS OF THE REMOVED EXISTING LIGHTING FIXTURES IF
FLORESCENT LAMP WAS REMOVED
LIGHTING LAYOUT INDICATING SQUARE FOOTAGE OF THE FACILITY
CERTIFICATE OF LED FIXTURE INDICATING IT IS ENERGY STAR OR NEEP APPROVED
PRODUCT
COOLING
MANUFACTURER’S EQUIPMENT SPECIFICATION SHEET OF THE NEW COOLING
EQUIPMENT PERFORMANCE AT ARI STANDARD CONDITIONS
CUT SHEET OF THE NEW ROOFING OR WINDOWS MATERIAL INDICATING THE
INSULATION EFFICIENCY
APPLICATION SUBMITTALS
(cont.)
 ADDITIONAL DOCUMENTS MUST BE PROVIDED AS PART
OF THE APPLICATION PROCESS IF INSTALLATION IS
COMPLETED PRIOR TO PRE INSPECTION
PHOTOS OF THE EXISTING LIGHTING FIXTURES INDICATING THE LAMP AND
BALLAST TYPE
LIGHTING
DISPOSAL RECORDS INDICATING THE QUANTITY OF THE DISPOSED LAMPS AND
BALLASTS
DATED SALES RECEIPT/INVOICE
PHOTOS OF THE EXISTING COOLING EQUIPMENT, SHOWING THE NAMEPLATE
AND SERIAL #
COOLING
MEP DESIGN OR MECHANICAL SCHEMATIC OF THE EXISTING SYSTEM
DATED SALES RECEIPT/INVOICE
WAITLIST

IN ORDER OF WHEN THE DEPOSIT WAS SUBMITTED

WHEN INCENTIVES ARE AVAILABLE, PROJECTS ON
WAITLIST WILL BE ACTIVATED IN ORDER

INSTALLATION MAY NOT BEGIN UNTIL THE PROJECT IS
ACTIVATED AND APPROVED
M&V APPROACHES
DEEMED SAVINGS
SIMPLIFIED M&V
FULL M&V
BASED ON DATA FROM PAST
DSM PROGRAMS AND
INDUSTRY DATA
BASED ON ENGINEERING
CALCULATIONS USING TYPICAL
EQUIPMENT CHARACTERISTICS
FOR PARTICULAR APPLICATIONS
REQUIRED FOR ALL MEASURES
NOT MEETING CRITERIA FOR
DEEMED OR SIMPLIFIED M&V
NO METERING REQUIRED
REDUCE NEED FOR CERTAIN
TYPES OF FIELD MONITORING
BY USING STIPULATED VALUES
FOR OPERATING HOURS,
EQUIPMENT EFFICIENCES, ETC.
USE MORE RIGOROUS
APPLICATION OF END-USE
METERING, REGRESSION
ANALYSIS, OR COMPUTER
SIMULATIONS
MAY INVOLVE SPOT OR SHORTTERM METERING AND
SOMETIMES SIMPLE, LONGTERM MONITORING
GENERAL GUIDELINES AVAILABLE,
BUT NEED TO BE ADAPTED TO
SPECIFIC MEASURE
INVOICING AND PAYMENT

PERFORMANCE PAYMENT
 BASED
ON VERIFIED SAVINGS AND APPROVED
SAVINGS REPORT
 DEEMED METHOD
 100%
 M&V
PAYMENT AFTER INSTALLATION REPORT
METHOD
 40%
AFTER INSTALLATION REPORT
 60% AFTER SAVINGS REPORT
RETROFIT APPLICATIONS BASELINE
EQUIPMENT TYPE
APPLICABLE BASELINE STANDARD
LIGHTING
TABLE OF STANDARD FIXTURE WATTAGES (BASED
ON EISA 2007, EPACT 2005 AND PUCT RULE)
COOLING EQUIPMENT
ASHRAE 90.1 EFFICIENCY STANDARD OF THE YEAR
WHEN REPLACED SYSTEM IS MANUFACTURED
MOTORS
ASHRAE 90.1M – 1995
BUILDING ENVELOPE
IECC 2003
NEW CONSTRUCTION BASELINE
EQUIPMENT TYPE
LIGHTING
APPLICABLE BASELINE STANDARD
EISA 2004, ENERGY STAR® OR DLC
COOLING EQUIPMENT
MOTORS
BUILDING ENVELOPE
FEDERAL STANDARD OR 2008 CITY OF
HOUSTON COMMERCIAL ENERGY
CONSERVATION CODE
PROGRAM RESOURCES

http://www.centerpointefficiency.com:
PROGRAM ANNOUNCEMENTS
 PROGRAM MANUAL
 WORKSHOP PRESENTATION
 SERVICE AREA MAP
 PROJECT AUTHORIZATION FORM
 HOST CUSTOMER AGREEMENT
 SPEADSHEET APPLICATIONS
 ACTIVE PROJECT SPONSOR LISTING
 INFORMATION ON AVAILABLE FUNDING
 PROGRAM CONTACTS AND LINKS

2013 PROGRAM
HIGHLIGHTS
PROGRAM GOALS/BUDGET
2013 SAVINGS GOAL
13 MW

2013 INCENTIVE BUDGET
$7 MILLION
ONE PROJECT SPONSOR MAY RESERVE UP TO 20% OF
THE PROGRAM BUDGET
PROGRAM TIMELINE

DECEMBER 3RD, 2012 DATABASE OPENS FOR APPLICATIONS


DECEMBER 18TH, 2012 APPLICATION SUBMITTAL DAY



BEGINS AT 10AM, FIRST COME, FIRST SERVE
DEPOSIT CHECK MUST BE SUBMITTED BEFORE THIS DATE IN
ORDER TO BE ELIGIBLE FOR SUBMITTAL
DECEMBER 1ST, 2013 PROJECTS INSTALLATION MUST BE
COMPLETE


DEPOSIT CHECKS MAY BE ACCEPTED
COMPLETE DATABASE APPLICATIONS, POST INSPECTIONS TO
FOLLOW
DECEMBER 30TH, CLOSE OUT 2013 PROGRAM

ALL PENDING PROJECTS SHOULD BE IN PAYMENT
PROCESS
CHANGES CONTINUING FOR 2013





LED PROJECTS SHALL REQUIRE AT LEAST ONE OF THE FOLLOWING
PROVIDED BY PROJECT SPONSORS:
 ENERGY STAR © QUALIFIED
 DESIGN LIGHT CONSORTIUM QUALIFIED PRODUCTS LISTING
 PREVIOUSLY UTILITIES REVIEWED AND APPROVED LED PRODUCT
STANDARD T8 BECOMES MINIMUM EFFICIENCY REQUIREMENT FOR NEW
LIGHTING FIXTURE
VARIOUS INCENTIVE RATE BY MEASURE TYPE
 Relamping is allowed with discounted incentive rate (30% of the non-LED
lighting incentives)
CUT SHEETS, SQUARE FOOTAGE & ALL PERTINENT DOCUMENTS ARE DUE
AT THE TIME OF PROJECT SUBMITTAL
RECYCLE CERTIFICATES OF LAMPS REQUIRED ON ALL
LIGHTING PROJECTS
2013 INCENTIVE RATES
MEASURE TYPE
$/KW
$/KWH
LIGHTING – FLOURESCENT, HID, CFL
120
.04
LIGHTING – LED
210
.08
COOLING – DX UNITS
240
.09
COOLING – CHILLER
260
.11
MOTOR
235
.09
VFD
180
.07
WINDOW FILM
200
.08
WINDOW REPLACEMENT
210
.08
ROOFING
240
.09
OTHER MEASURES
175
.06
NEW CHANGES

PROJECT APPLICATION REQUIREMENT



MINIMUM SAVINGS REQUIREMENT




20KW AND/OR 120,000KWH FOR SINGLE SITE
50KW AND/OR 300,000KWH FOR AGGREGATED SITES
LAST YEAR TO INCENTIVIZE T12 RETROFITS
UPDATED DEEMED FACTORS



REVIEW PROCESS BEGINS ONLY UNTIL ALL REQUIRED DOCUMENTS SUBMITTED.
INCENTIVES ARE NOT SECURE AT THIS MOMENT.
MODIFY PA WITHIN14 CALENDAR DAYS FROM PA SUBMITTED WILL NOT AFFECT
DEPOSIT
LIGHTING – UPDATED HVAC INTERACTIVE FACTORS
COOLING – UPDATED DEMAND AND ENERGY COEFFCIENTS
UPDATED BASELINE EFFICIENCY STANDARD

COOLING – APPLICABLE ASHRAE 90.1EFFICIENCY LEVEL ACCORDING TO YEAR
OF MANUFACTURE OF THE REPLACED SYSTEM
GETTING STARTED



REGISTER AS PROJECT SPONSOR IN ENERTREK VIA
DATABASE
CHECK WEBSITE AT
WWW.CENTERPOINTEFFICIENCY.COM FOR LATEST
INFORMATION
SEND HARD COPY OF APPLICABLE FORMS AND
DEPOSIT TO:
CENTERPOINT ENERGY
ATTENTION: YOLANDA SLADE
1111 LOUISIANA, 9TH FLOOR
HOUSTON, TX 77002
SUBMIT DAY
DECEMBER 18, 2012 @ 10:00 AM,
CENTRAL TIME
**IN ORDER TO SUBMIT YOUR PROJECT, CNP MUST
HAVE YOUR DEPOSIT BEFORE DECEMBER 18, 2012!**
SUPPLIER DIVERSITY
SUPPLIER DIVERSITY
POLICY STATEMENT


CENTERPOINT ENERGY, INC. RECOGNIZES THE
IMPORTANCE OF MINORITY AND WOMEN-OWNED
BUSINESS ENTERPRISES (MWBE) TO THE ECONOMIES OF
THE NATION, THE STATE, AND THE COMMUNITIES IT
SERVES, AS WELL AS THE CORPORATION ITSELF.
THEREFORE, WE ARE COMMITTED TO PURSUING BUSINESS
RELATIONSHIPS WITH SUCH ENTERPRISES AND USING
INNOVATIVE APPROACHES DESIGNED TO CONTINUALLY
IMPROVE BUSINESS OPPORTUNITIES.
SUPPLIER DIVERSITY
CENTERPOINT ENERGY


JEWEL SMITH, MANAGER OF SUPPLIER DIVERSITY
(713)207- 6951; [email protected]
STEVE DUKES, SUPPLIER DIVERSITY COORDINATOR
(713)207- 3388; [email protected]
HOUSTON MINORITY BUSINESS COUNCIL
CONSTANCE JONES (713)271–7805; WWW.HMBC.ORG
WOMEN’S BUSINESS ENTERPRISE ALLIANCE
APRIL DAY (713)681–9232; [email protected]
2013 LIGHTING
WORKBOOK
OVERVIEW
2013 LIGHTING WORKBOOK

CHANGES
 INELIGIBLE
FIXTURES
 STANDARD
 NEED
 SCREW
4’ T8’S
“CEE” DESIGNATION TO QUALIFY
IN CFL’S
 ALL T12
 ALL INCANDESCENT
 ALL MERCURY VAPOR
 ALL HIGH PRESSURE SODIUM
 STANDARD METAL HALIDE
2013 LIGHTING WORKBOOK

ENHANCEMENTS
RE-LAMP
LAMP
REPLACEMENT ONLY
REMOVE
A LINE
DETECT INELIGIBLE FIXTURES
2013 LIGHTING WORKBOOK

ENHANCEMENTS
 CENTRAL

SCREW IN CFL’S



WATTAGE TABLE ADDITIONS
150 WATT
65 WATT
T5HO




54 WATT
51 WATT
49 WATT
24 WATT
2013 LIGHTING WORKBOOK

ENHANCEMENTS
FIXTURE
 EASY
BUILDER
TO ENTER CUSTOM FIXTURES
 STANDARDIZES NAMING CONVENTION
 TRIGGERS CORRECT INCENTIVE IN
WORKBOOK
QUESTIONS?
CONTACT INFORMATION
 YOLANDA
SLADE
PHONE: 713-207-7762
 EMAIL – YOLANDA.SLADE@
CENTERPOINTENERGY.COM

 LORETTA
BATTLES
PHONE: 713-207-3543
 EMAIL – LORETTA.BATTLES@
CENTERPOINTENERGY.COM

 WEBSITE:

WWW.CENTERPOINTEFFICIENCY.COM

similar documents