Initial Engine Company Operations PowerPoint

Report
Initial Engine Company Operations
Accountability Training
Lessons Learned
– Command Post location
• Move away from the pump panel
once command is transferred from
the Engineer to an Officer
– Don’t swarm the Incident
Commander
• Command Aide
– Monitors the main radio frequency (Green)
• Incident Commander
Reminders
– Monitors the tactical radio frequency (Gold)
• Command Transfer Questions
Discussion Points
• Primary Size-up
1.
2.
3.
4.
5.
Arrival on scene
Description of the structure/vehicle
Description of the problem
Establish Command
Assign a tactical channel
– “E101 is on the scene of a small single story
residential structure with heavy black smoke
showing from side 1. E101 is assuming Shiloh
Command, all units check in on Gold upon arrival.”
Secondary Size-up
1.
2.
3.
4.
“Columbia, 360 complete...”
Confirm findings from Primary Size-Up
Announce the Command Post location.
Declare the Incident Strategy
a) Offensive or Defensive
Considerations during Secondary Size-up
1. Are occupants accounted for?
2. Is there a basement? (points of access)
3. Resource Determination/Allocation
a) Water supply strategy
b) Additional resources needed
4. Utilities
5. Exposures
Radio Traffic
•
•
•
•
5 step radio process
Status Checks
Conducting Personnel Accountability Reports
CAN Reports
– Conditions
– Actions
– Needs
Game Plan
• Size-up Scenarios
– Work with you crews and fill out the worksheet
for each scenario
• Operations
– Safety
• Rehab
– Dispatch
– Accountability
– Tactical Evolutions
• Water Supply