Process Instrumentation Diagram Tutorial Solution

Report
Using correct P&ID symbols, draw the following
instruments to the reboiler as shown in figure
below.
(i)
Steam pressure gauge
PG
(ii) Reboiler vapor pressure gauge
Reboiler vapor
(iii) Steam temperature gauge
PG
(iv) Vessel over pressure relief valve
TG
Steam
(v) Steam over pressure relief valve
(vi) Liquid level gauge at overflow
compartment
LG
LG
(vii) Liquid level gauge at liquid boiling
compartment
Condensate
Bottom product
(viii) Temperature gauge at liquid boiling
compartment.
Tower bottoms
TG
Install appropriate control systems for the
following tasks:
(i)
PC
TAH
I/P
Liquid level control at over flow
compartment
PT
TC
Reboiler vapor
(ii) Reboiler vapor pressure control
I/P
TT
(iii) Liquid temperature control
LAL
LAH
(iv) Reboiler vapor pressure alarm high
(v) Liquid temperature alarm high
(vi) Low and high level liquid alarm at
liquid over flow compartment
Steam
LC
LT
LT
LAL
I/P
(vii) Low liquid level alarm at boiling liquid
compartment
Condensate
(viii) Steam flow cut upon low liquid level.
Bottom product
Tower bottoms