Presentation Contents
•ENTSO-E business processes
•MAVIR Market processes
•MAVIR Planning processes
•MAVIR Operational processes
•MAVIR CIM tools
•Open issues
2015. július 17.
2
ENTSO-E business processes
Source:ENTSO-E CIM MEP v1.
•2009 - ENTSTO-E TSOs have been underlining their
commitmet to apply the CIM-based data
exchange format in all data exchange processes
2015. július 17.
3
MAVIR’s market processes
Source: ENTSO-E EDI Library
•MAVIR implemented most of the ENTSO-E EDI data
exchange formats
– Scheduling process (ESS)
– Capacity allocation and nomination process (ECAN)
– Settlement process (ESP)
– Reserve resource process (ERRP)
•MAVIR is affected by CIM Market integration (CME)
2015. július 17.
4
Planning processes
Source:ENTSO-E CIM MEP v1.
•CIM-based data exchange format is required by ENTSO-E
•MAVIR sends PSS/E (binary) format now
•Decided to buy or develop a CIM-based tool in the near
future
2015. július 17.
5
Operational processes
Source:ENTSO-E CIM MEP v1.
•CIM-based data exchane format is in test phase.
•MAVIR sends UCTE-DEF ASCII files as usual
•MAVIR sends CIM-XML for every wednesday
2015. július 17.
6
UCTE-DEF -> CIM-XML Converter
•1st Goal: replace EDF Converter
•Own converter since the end of 2010
•Developer: Astron Infomatika Kft.
•JAVA based application
•Fulfils MAVIR’s needs
– Doesn’t support the previously unused
functionalities (e.g. #E and #TT)
•Validated with CIMdesk only
2015. július 17.
7
New CIM XML generator module
•Siemens Spectrum upgrade from 3.4 to 3.11
•Now: Spectrum 3.8
•Some modules are CIM-based, some NOT
•Network Analyzer module works with text based
database only (DBNETD)
•We needed a new solution to generate CIM/XML
for DACF
•Developer: Astron Infomatika Kft.
•In the site acceptance phase
•Some open issues
2015. július 17.
8
What is needed for CIM DACF
Transmission system model
Generation schedules
Load schedules
Switching schedules
Transformer info
Load Flow solution
Node Voltage and angle
Power flow
Limit violation
Equipment
Topology
State Variables
2015. július 17.
9
Generating method 1
Populate CMMS with power system model
•Generate MRIDs
Common Model Management System +
Information Model Manager +Transmission
Network App.
•CIM-based master model repository and
model manager and user interface and
network analyzer
Model export back to text based database (DBNETD)
Model export to CIM-based RDF or XDF files
2015. július 17.
10
Generating method 2
New JAVA application pre-process the model
•Create Equipment and Static Topology
Populate the NA Dadabase from DBNETD
Copy EQ + static TP to Network App. servers
New FORTRAN procedure
•Create Dynamic Topology and State
Variables
2015. július 17.
11
Generating method 3
New JAVA-based generator
•Process the created models
•Generate ENTSO-E CIM-XML files
2015. július 17.
12
MAVIR’s CIM Solution +/•Based on ENTSO-E MEP v1 and ready for the Profile v2
•Manual and Automatic mode
•Provides CIM-XML for DACF and 2DACF
•Provides „full” model for CAO (Central Allocation Office)
•Generates EQ+TP+SV or ME
•Configuration files (e.g. important network parts)
•Does complete topological processing (e.g. Topological
islands)
•Supports incremental model exchange (just need headers)
•One way converter (only CIM-XML export)
•CMMS is new for us
•Validated with CIMdesk only
•3W Transfomer = 3 * 2W Transformer
2015. július 17.
13
Open issues
•X-nodes, Common Objects?
•Profile v1 referenced on draft standards
•System modeling issues
– What should we keep under 120 kV?
– No live or default value for a mandatory attribute?
•Lack of complete validation tool (functionally)
– ENTSO-E Network Modeling Database?
– Is CIMdesk enough?
•Lack of examples
•We need stronger CIM community
2015. július 17.
14
Thank you for your attention!