Managed Lanes Presentation.

Report
• What are Managed Lanes
• What are Express Lanes
• What are HOT Lanes
• Regional Express Lanes Network
• I-95 Express
• I-595 Express
• I-75 Express
What are Managed Lanes
• TxDOT defines a managed
lane facility as one that
increases freeway efficiency
by packaging various
operational and design
actions.
• Generally a “freeway within a
freeway” where a set of lanes
within the freeway cross
section is physically
separated from generalpurpose lanes
What are they?
• Physically Separated Toll
lanes with Controlled
Points of Access
• Utilize Fixed, Variable or
Traffic Responsive Tolls
to Manage Demand
• Also Known as ValuePriced Lanes
Objectives
• Relieve Congestion
• Optimize Use of Capacity
• Improve Operating
Speeds
• Provide Incentive for
Modal Shift
• Offer a Reliable
Alternative
HOT lanes are limited-access, normally barrier separated
highway lanes that provide free or reduced cost access to
qualifying HOVs, and sell additional capacity to other vehicles
which do not meet passenger occupancy requirements.
Operating with 10 years
(green)
• 95 Express Phase 1, 2, & 3
• I-595
• I-75
• SR 826
• SR 836
• HEFT (SR 836 to Caribbean)
Vision Project (purple)
• HEFT (SR 836 to I-75)
• HEFT (Caribbean to
Tallahassee)
• SR 924
• SR 874
• US 1
In Operation (green)
• 95 Express Phase 1
Under Construction (purple)
• I-595
• 95 Express Phase 2
Design or Design/Build (red)
• I-75
• HEFT (south of SR 836)
• SR 826 (SR 924 to SR 836)
PD&E (light blue)
• 95 Express Phase 3
• SR 826 (SR 924 to I-95)
• US 1
Phase 1&2
• District 6 tentatively
scheduled to operate
both Phase 1 & 2 until the
completion of Phase 3
Phase 3
• Griffin Road to Glades
Road (Tentative)
• Currently in PD&E
Phase 4
• Planned to extend
through Palm Beach
County
Before -
After -
• Will provide 3 reversible
express lanes within the
median
• Eastbound in the AM peak
period
• Westbound in the PM peak period
• Access from west of 136 Ave, east of SR 7 and direct
connect from Florida’s Turnpike
• Will utilize a variable tolling strategy
• Operated and maintained by 595 Express
• 4-lane tolled managed lanes facility in the I-75 median
• Express lanes direct connections to I-595, Florida’s
Turnpike (HEFT), and the Palmetto Expressway
• Intermediate express lanes ingress/egress locations at
Royal Palm Blvd., Griffin Rd., Sheridan St., Miramar
Pkwy., Miami Gardens Dr. and NW 154th St.
Example: Signing and tolls for to a motorist traveling
from SR 836 to I-595 via SR 826 and I-75
Prior to entry:
South of MGD:
Total Tolls: $9.00 (SR 836 to MGD) + $7.00 (MGD to I-595) =
$16.00