ETCS - UIC ERTMS World Conference

Report
www.thalesgroup.com
ETCS Level 2 Operational
Concept in Austria
11th UIC ERTMS World Conference - Istanbul April 2014
Dr. Ruth HIERZER / Thales
Manfred PISEK / ÖBB-Infrastruktur AG
Ground Transportation Systems
Thales in
Transportation
Ground
Ground
Transportation
Transportation
Systems
Systems
A specialist
in IT-based critical
systems for Transport
Thales Transportation Systems by the numbers
3 /
15,754 km of track equipped with the Thales ETCS solutions
219,949 Thales rail field equipment installed worldwide
15% traction energy savings with optimised train management, equivalent to
100 family homes power consumption
Ground
Ground
Transportation
Transportation
Systems
Systems
Thales Transportation Systems by the numbers
4 /
Up to
500,000 control points supervised from a single OCC
Real-time video surveillance transmission to OCC from all transport modes
Over
50 million ticketing transactions in 100 cities processed daily by Thales
Ground
Ground
Transportation
Transportation
Systems
Systems
Strategic Targets Infrastructure Operations OeBB
5 /
 Target network 2025+ represents a capable infrastructure for
more trains, passengers, goods, and synchronised traffic.

Key Figures – Network 2012

Key Figures – Network 2025+
(according to traffic forecasts)

5000 km of railroads

6500 trains per day

224 million passengers per year

113 million tons of goods per year

142 million km covered by trains

~ 4800 km of railroads

~ 9000 trains per day

~ 300 million passengers per year

~ 142 million tons of goods per year

~ 198 million km covered by trains
Source: N.Pausch, ÖBB-Inrastruktur AG




Reduced headway times - Efficient use of infrastructure
Higher train speeds
Synchronised traffic with well linked connections
Energy efficiency
Ground
Ground
Transportation
Transportation
Systems
Systems
Main Pillars of Strategy Implementation
6 /
Automatisation
Centralisation
ETCS deployment
Continued
Electronic Interlocking rollout
Civil works related network adaptations and
improvements
Ground
Ground
Transportation
Transportation
Systems
Systems
7 /
Ground
Ground
Transportation
Transportation
Systems
Systems
Integrated Operations - Automatisation
Integrated Operations - Centralisation
8 /

5 Operation Control Centers (OCC) are
responsible for the control and
dispatching of the complete core
network of the ÖBB
Increasing
productivity
Ground
Ground
Transportation
Transportation
Systems
Systems
Assuring the
highest level of
safety
Enhancing
quality
9 /
Longterm Investment Strategy for Integrated Operations
2032 Objective:
The operation control-strategy has been
implemented for the whole network
• the implementation is linked to projects
within the future network 2025+
In 2032
• approx. 1,700 employees
in network operations
• Approx. 94 staffed local
operation sites
• Approx. 145,000 Train km
covered per employee
2012 The operation control-strategy is being
implemented
• 1 integrated traffic management centre
• 5 operation control centres
In 2012
• 3,170 employees
in network operations
• 310 staffed local operation
sites
• 51,000 Train km covered
per employee
2005 Decision to implement the operation
strategy at ÖBB
Initial Position
• 4,455 employees
in network operations
• 530 staffed local operation
sites
• 37,000 Train km covered per
employee
Source: N.Pausch, ÖBB-Infrastruktur AG
Ground
Ground
Transportation
Transportation
Systems
Systems
10 /
ETCS Status 2014
Source: OeBB Infrastruktur AG
Ground
Ground
Transportation
Transportation
Systems
Systems
Austrian ERTMS/ETCS deployment strategy
Austrian ERTMS/ETCS deployment strategy
11 /
Deployment Train Control – Target 2025
Deployment ETCS under discussion
Deployment ETCS L2 decided
Rail Network OeBB
Source: OeBB Infrastruktur AG
Ground
Ground
Transportation
Transportation
Systems
Systems
First ETCS Level 2 Project in Austria
12 /

First ETCS L2 implementation for Austrian Railways with
two line sections on main railway corridor

Project duration: May 2009 – Dec 2012
First Putting into operation ETCS L2 in Austria
December 9th, 2012
Ground
Ground
Transportation
Transportation
Systems
Systems
OeBB‘s Operations Experience - Major Achievements
13 /
Significant travel time
reduction:
Vienna – Salzburg 2:20 h
2013: 1 Million Train KMs reached
Up to 270
trains/day with
speeds up to 230 km/h
2013: less than 200 delayminutes/month caused by ETCS
Ground
Ground
Transportation
Transportation
Systems
Systems
Experience and recommendations
14 /
o Involve experts with practical background from
the very beginning
o Set a clear target with corresponding timeline
and let them work – without intervention!
o Cooperate with suppliers as close as you can
o Necessity of clear and detailed operational and
technical specifications
o Supplementary integrations lab for early system
testing
Ground
Ground
Transportation
Transportation
Systems
Systems
Get the most
out of your infrastructure
www.thalesgroup.com
Ground Transportation Systems