Team 8 Capstone Project:
Online Musical Instrument
Store
Andrew Szewczyk
Gabriel Chaney
Agenda
• 1st Status Report
– Gabe
• Front-end design
• Back-end design
– Drew
• Server Design
• Issues With Server
• Next Steps
Front-End Design
• Primary Page Template (HTML & CSS)
– Layout
– Ascetics
• To-do
– More cross-browser testing
– Need to complete back-end first
Back-End Design
• Almost 50% complete
– Database design implemented
– Forms for `instrument` table
• Viewing, adding, and deleting
• It’s working!
Back-End Design
• To-do
– Image manager for `instrument` table
insertions & editing form
– `Customer` table forms
– Entity relationship forms
– Security (employee log-in)
– Speed optimizations
Server Design
• LAMP Progress
– Apache working on LAN
– Merging HTML design to server using FTP
and SSH.
– Using a sub domain from dyndns.com.
(Free)
Issues with Server
•
•
•
•
Apache works on LAN and not WAN.
Need to interface MYSQL with html.
Time investment.
Some web services violate ISP’s
acceptable use policies.
• Customer will likely not have the know
how to maintain a LAMP system.
Next Steps
• Make final decision on LAMP.
• Complete front and back-end design.
• Complete MySQL database design.