STI-2 Status (NCIA/CAP analysis)

Report
Core ACCS LOC1
A challenging program in all respects
Test
Engineering


Over 3900 Core System Requirements
– Core System Hardware
~1400
– Core System Software
~ 2500

About 12600 Software Requirements

SW Sizing estimates : 13000 KSLOCs
(13+ million lines of software)
– Real Time 75%
– Non Real Time 25%

System Design broken down in
10 HWCI and 9 CSCI
About 150 Software COTS



1
Over 11300 Software Requirements verified
–
Real Time ~ 7600
–
Non Real Time ~ 3700


NATO UNCLASSIFIED
Core System Requirements tested
–
3700 Verified
–
200 ~ remaining
All HWCI and CSCI implemented
–
HW Upgrade, Solaris 10
–
Secured and redundant environment
–
12 strings in factory
 15 Databases for MTIF and sites
 System version installed
weekly on 12 strings
10000 regression steps in 2010 for 6 system
versions (factory + sites)
Integration continuous in factory and 6 sites
ACCS Validation Sites
ARS Glons & STVF
CAOC Uedem
CARS Lyon Mt. Verdun
DCAOC Uedem
DACC Poggio Renatico
CARS Poggio Renatico
NATO UNCLASSIFIED
Main events towards fielding
Dec 2008
FST
Sep 2009
STI-1
Jun/Dec 2013
STII
1st version
Sep 2011
FST BU1
Mar 2013
STI-2
STIII
Apr 2014
June 2014
PSWA
2nd version
(BU1)
•
1st version was successfully tested in Factory (Factory System Test) in 2008 and in live
environment [System Test I-1 (STI-1) at System Test and Validation Facility (STVF)
located in the NPC] in 2009.
Major change integrated in the contract in 2007: Block Upgrade 1 (BU1) (mainly in
CAOC functionalities changes)
•
–
–
–
ACCS BU1 was successfully tested in factory in September 2011 and in live environment
System Test I-2 at STVF completed in March 2013 (with test under simulated peak load
conditions)
Following test performed & completed in 2 Validation Nations (BE, GE) and on-going in the two
remaining ones (FR & IT)
Final tests performed in multi-site configuration: System Test III
Up to Provisional Software Acceptance forecasted mid 2014
3
NATO UNCLASSIFIED
Main events towards fielding
Operational Evolution
Sep 2009
STI-1 FB
Jun 14
PSWA
Mar 2013
STI-2 BU1
BU1
In Service Support
Oct 2011
Spiral1 Award
Jul 2013
FCSE
Spiral 2
1. Operational requirements evolve:
– Operational needs regularly expressed by SHAPE (roadmap towards ACCS IOC) like JTS
interface, JCHAT capability
– Initial Operational Tests & Evaluations (IOT&E) after each live environment System Tests on site
bring potential new requests
•
1st IOT&E STI-1 in 2009 revealed shortfalls => improvements in Air Mission Control, workflow & HMI
grouped in a Spiral 1 enhancement.
•
Spiral 1 awarded in October 2011 successfully tested in factory in Jul 2013 will be merged with BU1
for final test STIII up-front PSWA
•
Work under preparation to introduce JTS interface and JCHAT capability towards ACCS IOC
•
Potentially Shortfalls from future IOT&Es (STI-2, STII & STIII) might also lead to additional Spirals
4
NATO UNCLASSIFIED
Main events towards fielding
Technical Evolution
Sep 2009
STI-1 FB
Mar 2013
STI-2 BU1
BU1
Jun 14
PSWA
In Service Support
Jul 2013
FCSE
Oct 2011
Spiral1 Award
Technical evolutions
2. Meanwhile technology is also evolving
•
Communication means: from point to point connectivity to networked connectivity (significant
communications expenses savings) => NATO General Segment System (NGCS) NATO secure
communication network contracted mid 2012.
•
Communication standard protocol: commercial world evolving towards so-called Everything over the
Internet => contracted mid 2012.
•
Radar Network connection (RADNET) contracted by mid 2012.
Those technical evolutions will be integrated within the appropriate timeline (before PSWA or during In
Service Support through replication contract activities).
5
NATO UNCLASSIFIED
ACCS LOC1 Test Process
Test &Evaluation
DT&E
IOT&E
• Developmental Test &
Evaluation (DT&E)
• Initial Operational Test
& Evaluation (IOT&E)
• DT&E verifies that the
system performs as
required in its intended
environment
• IOT&E evaluates that
the system is operationally
effective and suitable
• IOT&E is conducted by
AirC2PO&S with
Contractor support
• DT&E is conducted by
ACSI and its
Subcontractors / Partners
6
NATO UNCLASSIFIED
Sequence of Test events
MTIF
DryRun

FST
Formal Test
FST Be
FST BU1
FST Ge
DR
FST
DR
FT
FT
FST Ita
FST Fra
DR
STVF
FAT Spiral 1
FT
DR

FT
STIII
STI-2
STI
STI-1
DR
IOT&E
FT
DR
FT
IOT&E
DR
STII
Validation Sites
ARS Glons - Be
Dry-Run
FT
IOT&E
CAOC Uedem - Ge
Dry-Run
FT
DCAOC Uedem - Ge
Dry-Run
CARS LMV - Fr
CARS PR - It
ST II / III

DR
FT
IOT&E
IOT&E
DR
FT
IOT&E
FT
IOT&E
DR
FT
IOT&E
Dry-Run
FT
IOT&E
DR
FT
IOT&E
Dry-Run
FT
IOT&E
DR
FT
IOT&E
STII-2
DARS-QRP
7

IOT&E
FT
DR
NATO UNCLASSIFIED
FT
IOT&E
PSA
STIII
FT

DR
IOT&E
DR
STII-2
STII-1
DARS-1

FT
PSA
PSA